Société Bouzguenda Frères

Project

Development and Paving of a Road in Benin

Description of the work

Development and Paving of a Road in Benin

The project involves roadworks to improve transport infrastructure in the Bopa region of Benin. The works include the construction of roads and pavements, various utility networks, as well as the development of intersections and bus stops.

DÉTAILS DU PROJET

Client: Ministry of Equipment and Transport of Benin

Fin du projet: 2009

Localisation: Bopa - Benin

Montant: 22 000 000 DT

Etendue des travaux:

  • Execution of 300,000 m³ of earthmoving for general earthworks
  • Installation of a 150,000 m³ lateritic gravel foundation layer
  • Installation of a base layer of lateritic gravel stabilized with 4% cement, treated with a pulvimixer, using 70,000 m³ of laterite and 6,500 tonnes of cement
  • Application of a two-layer surface coating over a length of 43,820 linear meters
  • Development of seven intersections, including two roundabouts, and bus stops in urban areas.
  • Special treatment of three marshy areas through the construction of 84 culverts for a total volume of 6,000 m³ of concrete
  • Installation of 10,000 linear meters of covered rectangular drainage channel

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.