Société Bouzguenda Frères

Project

headquarters of the Tunisian-Libyan Bank

Description of the work

headquarters of the Tunisian-Libyan Bank

SBF completed the construction of the office building for the headquarters of the Tunisian-Libyan Bank (BTL). With its double basement level converted into parking, its ground floor housing a separate bank branch and its seven floors including an executive floor, the building has become an icon in the business district of the northern urban center of Tunis and now offers the bank's more than 250 employees a modern and pleasant working environment.

DÉTAILS DU PROJET

Client: BTL - Tunisian-Libyan Bank

Fin du projet: 2017

Localisation: North Urban Center, Tunis

Montant: 13 000 000 DT

Etendue des travaux:

  • Area: 13,000 m²
  • Earthworks
  • deep foundation work
  • Structural work
  • Installation of hollow-core slabs
  • Masonry and plastering work
  • Finishing work: false ceilings, floor and wall coverings, interior and exterior carpentry, painting, etc.
  • Ventilated façade work
  • Exterior landscaping and infrastructure (roads and various networks)

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.