The project involves the construction of the structural framework for a retail and leisure center, an ambitious architectural project with 90,000 m² of covered area. This center includes more than 600 underground parking spaces, a 9,000 m² hypermarket, 95 shops, a play area, 8 cinemas, and a food court.

DÉTAILS DU PROJET

Client: COPIT Real Estate and Tourism Development Company

Fin du projet: 2019

Localisation: Mornag, Ben Arous

Montant: 36 000 000 DT

Etendue des travaux:

  • Earthworks and excavations
  • Foundation work
  • Reinforced concrete works at height
  • Composite beam floor construction
  • waterproofing work
  • Masonry and plastering work

Spécificités du projet:

  • This large-scale project required the installation of five tower cranes, including two on rails, for the execution of more than 60,000 m² of flooring requiring 33 expansion joints.
  • Execution of 13,500 m² of mixed floors with spans of 16 meters, a technique developed by SBF.

Chiffres clés:

  • Quantity of fill material selected: 12,700 m³
  • Quantity of concrete poured: 43,500 m³
  • Floor Area: 60,000 m²
  • Mixed floor area: 13,520 m²
  • Road surface area: 55,000 m²

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.