Project

Higher Institute of Technological Studies (ISET) of Rosso

Description of the work

Higher Institute of Technological Studies (ISET) of Rosso

The project consists of the construction of a complex of buildings for the Higher Institute of Technological Studies (ISET) of Rosso, Mauritania, including educational infrastructure, a business incubator, accommodation for students and teachers, catering services, service premises, a sports area, as well as the roads and various networks necessary for the operation of the institute.

DÉTAILS DU PROJET

Client: Mauritanian State

Fin du projet: 2009

Localisation: Nouakchott, Mauritania

Montant: 15 700 000 DT

Etendue des travaux:

  • Area: 14,000 m²
  • Structural works, including the infrastructure and superstructure of buildings.
  • Finishing work, including masonry, plastering, painting, carpentry, coatings and waterproofing.
  • Electrical work and installation of the fire safety system
  • Fluid works, including sanitary plumbing and drinking water supply.
  • Installation work for air conditioning and ventilation systems
  • roadworks and stormwater and wastewater drainage network construction

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.