Project

Rehabilitation of the Sobratah–Zouara coastal road

Description of the work

Rehabilitation of the Sobratah–Zouara coastal road

The Sobratah–Zouara coastal road rehabilitation project (a 20 km single-lane, two-way road) in Libya aims to improve and modernize a strategic section of international road infrastructure. This road runs along the Mediterranean coast across the entire width of the country, connecting the Tunisian and Egyptian borders. The works include road resurfacing, structural reinforcement, drainage improvements, and signage upgrades, thus contributing to better connectivity, increased safety, and the economic development of the region.

DÉTAILS DU PROJET

Client: Libyan Ministry of Transport.

Fin du projet: 2025

Localisation: Sobratah–Zouara, Libya

Montant: 25 500 000 DT

Etendue des travaux:

  • Milling of the old wearing course to a thickness of 6 cm.
  • Widening of the roadway by 1.80 m on each side, including: excavation work and placement of two layers of 0/20 all-in aggregate, with a total thickness of 40 cm.
  • Installation of a new layer of bitumen gravel with a thickness of 6 cm.
  • Reinforcement of road widenings by means of a reinforcing geogrid, laid over a width of 2.50 m on either side of the road.
  • Construction of the reinforced wearing course by adding an anti-rutting additive (PR Flex 20), over a width of 11 m, over the entire length of the route.
  • Construction of the verges using 0/20 aggregate.
  • Vertical and horizontal signage work.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.