Société Bouzguenda Frères

Project

HASDRUBAL PRESTIGE THALASSA II HOTEL

Description of the work

HASDRUBAL PRESTIGE THALASSA II HOTEL

Construction of a large hotel complex, comprising a garden level, a ground floor, and two upper floors. The hotel offers 258 suites, a lobby, an atrium, four restaurants, and a thalassotherapy and fitness center. The building's layout is designed to create a central oasis-like space, open to the coastline.

DÉTAILS DU PROJET

Client: SET

Fin du projet: 2007

Localisation: Djerba, Tunis

Montant: 25 650 000 DT

Etendue des travaux:

  • Area: 100,000 m²
  • General earthworks
  • Construction of the foundations
  • Reinforced concrete works
  • Masonry and plastering work
  • Installation of various coatings
  • Thermal and acoustic insulation and waterproofing work
  • Carpentry work, including the installation of wooden and aluminum frames and subframes
  • sanitation network construction work
  • Construction work on the architectural concrete facades using special metal molds and a resin and silicone formwork skin.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.