RADES BRIDGE: EARTH MOVEMENTS, EMBANKMENTS AND ROADWAYS

Description of the work

RADES BRIDGE: EARTH MOVEMENTS, EMBANKMENTS AND ROADWAYS

This project, commissioned by the Japanese company Taisei Corporation, consists of carrying out the essential preparatory work for the construction of an extradosed cable-stayed bridge.

DÉTAILS DU PROJET

Client: Taisei [Japon]

Fin du projet: 2008

Localisation: Rades, Ben Arous

Montant: 18 900 000 DT

Etendue des travaux:

  • Lake fill work with 500,000 m³ of sand, placed on a bed of geotextile.
  • Installation work of 600 kilometers of geodrains at an average depth of 13 meters, with a 1m x 1m grid.
  • Construction work on the platform of the tracks and access ramps with 286,000 m³ of crushed gravel with an average thickness of 1.60 meters.
  • Preloading work on the ground with 300,000 m³ of crushed material, placed at a height of 5 to 8 meters (removed after stabilization).
  • Construction work for the roadbed, including a subbase layer of crushed gravel, a foundation layer of 0/20 GRH, a base layer of bituminous gravel and a wearing course of anti-rutting bituminous concrete.

Spécificités du projet:

  • Rare and complex, the Radès bridge project is an engineering marvel. Located some twenty meters above the water, it represents a first in Tunisia and on the African continent as an extradosed cable-stayed bridge. Its concrete structure spans three continuous spans (70m - 120m - 70m), elegantly supported by two pylons reaching a height of 45 meters. The specific characteristics of the site, with its compressible lacustrine soil, necessitated the construction of deep foundations, anchored to a depth of 80 meters.

Chiffres clés:

  • Sand: 500,000 m³
  • Geodrains: 57,453 m³
  • Crushed materials: 300,000 m³

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.