Société Bouzguenda Frères

Project

Language Center on the banks of the Lac

Description of the work

Language Center on the banks of the Lac

The Language Center project in Berges du Lac, Tunis, is the construction of a facility dedicated to teaching and learning various languages. Located in a modern and accessible neighborhood, it aims to provide a modern learning environment and language resources to meet the needs of a diverse population. The project comprises an administration building, a training center, a multipurpose hall, a student residence, a restaurant with a kitchen, underground parking, and technical facilities. It was a single-contract project.

DÉTAILS DU PROJET

Client: Ministry of Education

Fin du projet: 2014

Localisation: Berges du Lac II, Tunis

Montant: 7 300 000 DT

Etendue des travaux:

  • Area: 4000 m²
  • Structural work
  • Finishing work
  • Roadworks and Various Networks
  • Electrical and fire safety work
  • Heating, air conditioning and plumbing work

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.