Société Bouzguenda Frères

Project

STRENGTHENING OF GP1

Description of the work

STRENGTHENING OF GP1

The project involves the development and strengthening of National Road RN1, including:

  • Construction of two pedestrian overpasses
  • Widening of the roadway
  • Construction of sidewalks
  • Road safety works

DÉTAILS DU PROJET

Client: Ministry of Equipment and Housing

Fin du projet: 2016

Localisation: Hammam-Lif, Ben Arous

Montant: 16 000 000 DT

Etendue des travaux:

  • site clearance work
  • Earthworks
  • Road construction work
  • Drainage works
  • Signage and equipment work
  • Public lighting works

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.