Société Bouzguenda Frères

Project

Mall Of Sousse shopping center

Description of the work

Mall Of Sousse shopping center

The project consists of the construction of a large shopping and leisure center, the Mall of Sousse. SBF and SICEP TUNISIE carried out the infrastructure work for this large-scale building.

DÉTAILS DU PROJET

Client: MALLS OF TUNISIA REAL ESTATE

Fin du projet: 2018

Localisation: Kalâa Kebira, Sousse

Montant: 8 300 000 DT

Etendue des travaux:

  • Area: 14,600 m²
  • Earthworks
  • Foundation work
  • Construction of a rainwater collection basin
  • Construction of a stormwater retention basin
  • Construction of retaining walls
  • VRD (Roads and Various Networks)

Spécificités du projet:

  • This construction project was distinguished by a joint venture between two companies, SBF and SICEP TUNISIE, with a clear division of tasks. SBF handled all the foundation and earthworks, while SICEP produced the prefabricated structural elements.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.