Djebel El Ouest Brickyard

Description of the work

Djebel El Ouest Brickyard

The project involves the construction of a brick factory in Jbal Oust, a state-of-the-art facility with a production capacity of approximately 1200 tons of fired clay per day.

DÉTAILS DU PROJET

Client: Poulina Group Holding - BBM Company

Fin du projet: 2019

Localisation: Djebel El Ouest, Zaghouan

Montant: 13 800 000 DT

Etendue des travaux:

  • General grounds
  • VRD
  • Reinforced concrete foundation
  • Reinforced concrete in elevation
  • Paving
  • Laceramic prefabricated flooring
  • Laceramic prefabricated fence
  • Masonry fence
  • Casing
  • Waterproofing
  • Coating
  • Masonry (red brick and concrete blocks)

Spécificités du projet:

  • SBF has brought all its knowledge, skills, tools and working methods to bear in order to carry out the complex works of this large-scale project.

Chiffres clés:

  • Area: 24,000 m²
  • Earth movement: 170,000 m³
  • Concrete poured: 21,000 m³
  • Bituminous concrete: 39,000 m³

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.