Transfers of desalinated seawater from SDEM ZARAT to Gabes and Southern Tunisia — Lot 1

Description of the work

Transfers of desalinated seawater from SDEM ZARAT to Gabes and Southern Tunisia — Lot 1

The project consists of constructing the infrastructure for transporting drinking water produced by the Zarat desalination plant to the Gabès region and southern Tunisia. It includes the supply, transport, installation, and testing of large-diameter pipelines, as well as the construction of essential standard structures for the operation of the transfer network.

DÉTAILS DU PROJET

Client: SONEDE

Fin du projet: 2021

Localisation: Zarat, Gabès

Montant: 6 500 000 DT

Etendue des travaux:

  • General Earthworks: Preparation of trenches and rights-of-way for the installation of pipelines and structures.
  • Supply and installation of pipes: Installation of DN 800 mm prestressed concrete and cast iron pipes along the entire route.
  • Pipe and connection equipment: Installation of valves, seals, manholes and other accessories necessary for the proper functioning of the network.
  • Construction of standard structures: Creation of specific structures such as high points (for air purging) and low points (for drainage).
  • Pipeline testing: Leak and pressure tests to ensure network integrity.

Chiffres clés:

  • 20,200 ml of DN 800 mm prestressed concrete pipe
  • 1,700 ml of ductile iron pipe DN 800 mm

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.