Repair of the quay area at the Port of Rades

Description of the work

Repair of the quay area at the Port of Rades

The project to refurbish the quayside area at the port of Radès in Tunisia consists of renovating and improving existing infrastructure along quays 2 to 7 and their adjacent landfills in order to ensure more efficient and secure port operations.

DÉTAILS DU PROJET

Client: MERCHANT MARINE AND PORTS OFFICE

Fin du projet: 2022

Localisation: Port de Rades, Ben Arous

Montant: 4 000 000 DT

Etendue des travaux:

  • Area: 30,000 m²
  • Demolition and stripping work on existing, degraded infrastructure
  • Construction work for a concrete slab
  • Road and pavement repair work
  • Repair and restoration work on deteriorated areas of the capping beams

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.