Société Bouzguenda Frères

Project

Reorganization and renovation of the SICAM unit

Description of the work

Reorganization and renovation of the SICAM unit

The project concerns the redevelopment and renovation of the production unit of the Société Industrielle des Conserves Alimentaires (SICAM). This project aims to modernize the existing facilities and increase the company's production capacity.

DÉTAILS DU PROJET

Client: SICAM: Industrial Food Canning Company

Fin du projet: 2022

Localisation: Majaz Al Bab, Beja

Montant: 11 000 000 DT

Etendue des travaux:

  • Area: 18,000 m²
  • Earthworks
  • Reinforced concrete works
  • Pipeline work
  • Road and utility works

Spécificités du projet:

  • The main challenge of this project, with a very tight deadline of three months, is to strictly adhere to the delivery date of each structure in order to allow the installation of equipment and ensure the start-up of the factory within the allotted time.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.