RENOVATION AND EXTENSION OF THE ZINA UNIT

Description of the work

RENOVATION AND EXTENSION OF THE ZINA UNIT

The renovation and expansion project for the ZINA unit in Oued El Hajar, Kelibia, was completed in just six months, successfully modernizing and increasing the production capacity of this tomato processing plant while managing significant technical and environmental constraints. This project included the construction of all the necessary infrastructure for such a factory, including specialized structures such as a settling tank, a reactor, a filtration unit, and a complete deep process network with specialized piping and fittings, taking into account the presence of a water table.

DÉTAILS DU PROJET

Client: ZNAIDI FOOD INDUSTRY COMPANY

Fin du projet: 2024

Localisation: Oued El Hajar, Kelibia

Montant: 11 500 000 DT

Etendue des travaux:

  • Installation of CFA piles for the foundation.
  • Earthworks.
  • Demolition work on existing structures to be renovated or extended.
  • Carrying out various works, potentially including specific finishing touches or modifications.
  • Waterproofing work.
  • Supply and installation of metal elements (framework, support structures, etc.).
  • Installation of PVC and HDPE pipes for fluid networks (water, sanitation, etc.).

Spécificités du projet:

  • Tight deadline for project completion: 6 months
  • Complex phasing for the execution of all works, particularly the deep process network with special pipes and accessories in the presence of a water table.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.