Project

Construction of an engineering structure linking Route X20 to the Chinese Runway

Description of the work

Construction of an engineering structure linking Route X20 to the Chinese Runway

The project involves the construction of an engineering structure to connect the X20 road to the Chinese track in the governorate of Mannouba. This infrastructure includes the construction of five slip roads, as well as stormwater management systems connected to the existing wadi (dry riverbed). The X20 road has two lanes in each direction, with 8-meter-wide carriageways and a 12-meter-wide central reservation. The Djebel Ammar road has two two-way lanes, a 5-meter-wide carriageway, and a 2-meter-wide shoulder. A bridge perpendicular to the X20, 64.15 meters long and 11.8 meters wide, has been constructed.

DÉTAILS DU PROJET

Client: Ministry of Equipment, Housing and Infrastructure, Manouba Regional Directorate

Fin du projet: 2025

Localisation: Mannouba, Tunisie

Montant: 11 780 000 DT

Etendue des travaux:

  • Land clearance and earthworks: Preparatory work, topsoil stripping and earthmoving (cut/fill)
  • Construction of the Engineering Structure: Construction of a bridge 64.15 m long and 11.8 m wide crossing the X20, including deep foundations, supports, deck and restraint devices.
  • Road Infrastructure: Development of Route X20, rehabilitation of the Djebel Ammar Road (5m two-way road), construction of 5 connecting ramps and roadway improvements
  • Sanitation and Hydraulics: Implementation of the rainwater drainage system and development of discharge structures towards the existing wadi.
  • Public Lighting: Installation of the underground electrical network and control cabinets.
  • Installation of lampposts throughout the interchange and the engineering structure.

Spécificités du projet:

  • The work was completed ahead of schedule.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.