The Lear Corporation TCS project is a new, state-of-the-art production facility belonging to the American group Lear Corporation, a world leader in automotive equipment. Located in Menzel Bourguiba, this plant specializes in the manufacturing and assembly of Thermal Comfort Systems, including advanced heating, ventilation, and massage solutions for automotive seats. With a covered area of ​​32,050 m², the site incorporates high-precision infrastructure and specific technical installations to meet the most demanding technological standards of the global automotive industry.

DÉTAILS DU PROJET

Client: Lear Corporation

Fin du projet: 2025

Localisation: Menzel Bourguiba Bizerte, Tunisie

Montant: 100 910 000 DT

Etendue des travaux:

  • This project, which represents a major expansion of the group's production capacity, was carried out by SBF as a turnkey project, comprising the following packages:
  • Civil Engineering & Finishing Works: Structural works including high-precision infrastructure, a structure combining a prefabricated concrete frame and a steel frame, as well as the installation of hollow-core slabs. This package also includes a reinforced industrial slab to support the production lines for electronic and thermal components.
  • Fluids & Process: Installation of specialized plumbing systems, as well as high-performance heating, ventilation, and air conditioning (HVAC) solutions
  • Electricity & Intelligent Systems: Implementation of a complete electrical infrastructure (high/low voltage power supply, lighting) and advanced security systems. This package covers the specific energy requirements for test benches and electronic assembly units.
  • Fire Safety (Sprinkler): Installation of an automatic fire suppression system of the Sprinkler type covering the entire 32,050 m², guaranteeing optimal protection of personnel and high-tech equipment.

Spécificités du projet:

  • a large-scale industrial project, completed within ambitious deadlines, incorporating advanced construction technologies and complying with the strict standards of the automotive industry

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.