Combined Cycle Power Plant

Description of the work

Combined Cycle Power Plant

The Radès C multi-shaft combined-cycle power plant, with a capacity of 450 MW, is a major STEG project aimed at efficiently increasing electricity production in Tunisia. The project involves the construction of an industrial complex, primarily including the execution of the following structures:

  • Gas turbine
  • Steam turbine
  • Pumping station
  • Technical and administrative buildings

DÉTAILS DU PROJET

Client: GAMA

Fin du projet: 2020

Localisation: Rades, Ben Arous

Montant: 38 000 000 DT

Etendue des travaux:

  • Earthworks
  • special foundation works
  • Reinforced concrete structure works
  • Retaining wall works
  • Installation and driving of concrete pipes
  • Road and utility works

Spécificités du projet:

  • Rigorous Planning: Complex breakdown into work packages, anticipation of deadlines, and use of advanced project management tools
  • Complex logistics due to the multiplicity of actors involved, requiring rigorous coordination and flawless organization to ensure the smooth running of the work.
  • Strict requirements in terms of hygiene, safety and environment
  • Strict quality standards requiring rigorous execution of work, testing, and controls

Chiffres clés:

  • Quantity of Concrete: 25,000 m³
  • Quantity of steel: 4,300 tonnes
  • Sheet pile works: 14,500 m²
  • Length of concrete pipes: 600 mL (diameters 2000 and 2800 mm)

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.