Description of the work

COMPLETION OF THE EXTENSION AND RENOVATION OF THE YAZAKI FACTORY

The project involves the completion of the expansion and renovation of a factory belonging to the Japanese Yazaki Group in Tunisia. Yazaki is a major automotive supplier specializing in wiring systems. This project aims to finalize the expansion and modernization of one of their Tunisian production units to increase production capacity and introduce new technologies in the manufacturing of wiring harnesses and automotive components.

DÉTAILS DU PROJET

Client: YAZAKI AUTOMOTIVE PRODUCTS TUNISIA (YAPT)

Fin du projet: 2024

Localisation: El Alia, Bizerte

Montant: 17 250 000 DT

Etendue des travaux:

  • Covered Area: 20,000 m²
  • Demolition work on existing elements to be modified or replaced.
  • Civil engineering works for the completion of the extension and the renovation of the structures.
  • VRD (Roads and Various Networks) works for the exterior development and the necessary networks.
  • Low voltage and automation work, including control, communication, etc. systems.
  • High-voltage electrical work, including general electrical installation and power supply to equipment.
  • Installation and implementation of fire safety systems.
  • Landscaping of outdoor spaces.
  • Supply and installation of all joinery (doors, windows, cupboards, etc.).
  • Painting work for interior and exterior finishes.
  • Construction of various works, potentially specific unspecified developments.

Spécificités du projet:

  • Tight deadline for project completion: 9 months
  • Agile and rigorous management proved essential for this single-lot project, which involved the completion of an industrial unit in operation within a local and international context.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.