Description of the work

Completion work on the Bouassida Interchange

The purpose of this contract is the execution of the completion works for the Bouassida interchange located at the intersection of the ring road at km4 and the RN1 at PK265 in the city of Sfax. The works include the construction of a ring road composed of two adjacent structures crossing the SNCFT railway line and the RN1 road, two slip roads in the form of structures crossing the SNCFT railway line, and a roundabout on the RN1.

DÉTAILS DU PROJET

Client: Ministry of Equipment, Housing and Territorial Development

Fin du projet: 2010

Localisation: SFAX

Montant: 6 700 000 DT

Etendue des travaux:

  • Work to clear the right-of-way, as well as the demolition of the roadway and existing buildings.
  • General earthworks
  • deep foundation work
  • Structural work
  • Construction work on the roadway and its associated infrastructure (roadbed and wearing course)
  • Drainage works
  • Safety equipment work
  • public lighting works
  • Landscaping work

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.