Construction of a 400 MW combined cycle power plant in Ghannouch - Gabes

Description of the work

Construction of a 400 MW combined cycle power plant in Ghannouch - Gabes

This contract covers the execution of civil engineering works for the Ghannouche combined cycle power plant (1 x 400 MW). These works include the foundations of the turbines (alternator, steam and gas), as well as the construction of an electrical building, a utilities building, a feedwater tank, transformers, a heat recovery boiler, a pumping station, reservoirs, roads and various networks.

DÉTAILS DU PROJET

Client: Tunisian Electricity and Gas Company - STEG

Fin du projet: 2011

Localisation: Ghannouch - Gabes

Montant: 37 200 000 DT

Etendue des travaux:

  • Earthworks involving filling and excavation
  • Structural work
  • Finishing work
  • Electrical work
  • Metal framework construction

Spécificités du projet:

  • A major challenge of the project is the firm commitment to respecting HSE rules as a top priority, aiming for exemplary control of safety and environmental aspects during the construction of the power plant. The ultimate goal is to achieve "zero accidents" by ensuring the health, safety, and well-being of everyone present on the construction site, and by preventing any personal injury or property damage.

Chiffres clés:

  • 73,000 m³ of earthworks in the form of fill
  • 20,000 m³ of concrete
  • 1,800 m³ of steel for concrete
  • 1,500 m² of metal structure

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.