Development of the Enfidha Industrial Zone

Description of the work

Development of the Enfidha Industrial Zone

The project consists of the development of the first tranche, second phase, of the Enfidha industrial zone by carrying out the infrastructure ranging from the earthworks of the roads to the installation of sanitation networks and outdoor lighting, thus contributing to the development of this strategic area.

DÉTAILS DU PROJET

Client: The company of the Sousse Competitiveness Cluster

Fin du projet: 2020

Localisation: Z.I Enfidha, Sousse

Montant: 8 500 000 DT

Etendue des travaux:

  • Area: 42 ha
  • Earthworks
  • Work to install sanitation networks (wastewater and stormwater)
  • Road construction and surfacing
  • Construction of a wastewater pumping station (lifting station)
  • Installation of conduits for various networks
  • Installation of fire hydrants
  • Installation of outdoor lighting

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.