Development work on the El Fejja Industrial Activity Park

Description of the work

Development work on the El Fejja Industrial Activity Park

The project involves the development of the El Fajja Industrial Park in Manouba. The project began with the first phase, which was completed in 2011. Highly satisfied with the work performed, MFCPOLE decided to entrust SBF with the second phase of the park's development. The work for this phase consists of additional double-layer road surfacing on a pre-prepared site, followed by an extension including the construction of new roads and drainage and sanitation networks.

DÉTAILS DU PROJET

Client: MFCPOLE

Fin du projet: 2014

Localisation: EL FEJJA, MANOUBA

Montant: 11 500 000 DT

Etendue des travaux:

  • General earthworks
  • Road network works, including the rehabilitation and finishing of existing roads
  • Construction work for stormwater and wastewater networks
  • public lighting works
  • Ducting and substation construction work
  • horizontal and vertical signage works

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.