Embassy of the United States in Rabat

Description of the work

Embassy of the United States in Rabat

Building on a successful collaboration during the construction of the American Embassy in Tunisia, our partner BL HARBERT entrusted us with the civil engineering work for the American Embassy in Morocco. The project includes the construction of the main building, with a covered area of ​​17,000 m², as well as two semi-underground parking garages totaling 11,000 m².

DÉTAILS DU PROJET

Client: BL-Harbert USA

Fin du projet: 2013

Localisation: Rabat - Morocco

Montant: 26 500 000 DT

Etendue des travaux:

  • Execution of 200,000 m³ of preparatory excavation
  • Pouring of 26,000 m³ of reinforced concrete for the structures
  • Implementation of 3,600 tonnes of steel in the structures

Spécificités du projet:

  • The biggest challenge of maintaining the walls of the excavations adjacent to the surrounding buildings was met by using the CFA pile technique with the installation of anchor rods and the application of shotcrete.
  • The work was completed one month ahead of schedule, to the client's complete satisfaction.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.