Description of the work

Extension of the aircraft parking area at Sfax-Thyna aerodrome

Project consisting of the expansion of the aircraft parking area at Sfax-Thyna aerodrome, aimed at increasing its capacity and optimizing aircraft traffic. The expansion also includes the creation of an access road linking the Aircraft Rescue and Firefighting Service (ARFF) to the runway, measuring 186 meters long and 10 meters wide.

DÉTAILS DU PROJET

Client: Office of Civil Aviation and Airports (OACA)

Fin du projet: 2021

Localisation: Aéroport Sfax-Thyna

Montant: 6 800 000 DT

Etendue des travaux:

  • Extension area: 31,000 m²
  • Milling and demolition of existing structures.
  • Installation of foundation structures for the new aeronautical coatings and the access road.
  • Execution of the rigid concrete pavement using the slipform technique (Splitform) for laying cement-treated aggregate, surface concrete and transition slabs.
  • Creation of the necessary expansion and contraction joints.

Spécificités du projet:

  • Aeronautical standards: The work must comply with the standards and regulations specific to airport infrastructure in terms of safety, dimensioning and quality of materials.
  • Rigid concrete pavement: The use of the Slipform technique for the construction of the concrete pavement ensures a durable surface that is resistant to the heavy loads of aircraft.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.