FIRST PHASE OF THE RAPID RAILWAY NETWORK OF GREATER TUNIS – LOT NO. 3 – STATION BUILDINGS LINE D

Description of the work

FIRST PHASE OF THE RAPID RAILWAY NETWORK OF GREATER TUNIS – LOT NO. 3 – STATION BUILDINGS LINE D

Lot No. 3 of the first phase of the Greater Tunis Rapid Rail Network (RFR) project, specifically for Line D, concerns the construction of the buildings for the eight stations on this line connecting Tunis to Gobaa. This lot includes the construction of passenger facilities such as platforms, ticket offices, and waiting areas. It is a key component of the overall RFR project, which aims to modernize public transportation in Greater Tunis by providing a high-capacity, rapid transportation alternative to alleviate traffic congestion.

DÉTAILS DU PROJET

Client: The Tunis Rapid Rail Network - RFR

Fin du projet: 2025

Localisation: Tunis

Montant: 42 700 000 DT

Etendue des travaux:

  • Total covered area of ​​the 8 stations: 16,000 m²
  • Total covered area of ​​the shelters on the quays: 6,000 m².
  • Study and execution of works for the construction of the eight (8) stations, including:
  • Civil engineering
  • VRD
  • Fluid networks
  • Electricity
  • Elevators
  • Fire safety systems
  • Telephony
  • Sound system
  • Monitoring

Spécificités du projet:

  • Simultaneous work on 8 separate sites in an active railway zone (maintaining 2 operational tracks).
  • Rigorous management is required for work involving complex interactions with other work packages (Civil Engineering, Roads and Utilities, Systems, etc.).
  • Use of adapted construction methods such as auxiliary decks and Lutetian-type shielding walls
  • Strict safety, hygiene and environmental controls.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.