Grade separation of intersections on the Km 4 Ring Road, Sfax – Lot No. 2: Intersections RN13 and RN14

Description of the work

Grade separation of intersections on the Km 4 Ring Road, Sfax – Lot No. 2: Intersections RN13 and RN14

The project aims to improve traffic flow and safety on the Km 4 ring road at the intersections with national roads RN13 and RN14. Two viaducts have been built over these intersections to eliminate direct crossings between ring road traffic and traffic on RN13 and RN14, thus allowing for a faster and safer flow of vehicles coming from Tunis and heading towards Gabès (and vice versa).

DÉTAILS DU PROJET

Client: Ministry of Equipment and Territorial Development

Fin du projet: 2022

Localisation: Rocade km 4 , Sfax

Montant: 48 900 000 DT

Etendue des travaux:

  • Clearing of the land
  • Earthworks
  • deep foundation work
  • sanitation and drainage works
  • Construction of hydraulic structures under the ramps and under each roundabout
  • Construction of two adjacent bridges with continuous reinforced concrete slab decks, each consisting of three decks with a total length of 264 m
  • Roadworks and roundabout construction
  • Public lighting, signage, and safety equipment works

Spécificités du projet:

  • Managing local residents: the impact of the works on the daily lives of residents and businesses
  • The complexity of the works and the need to maintain traffic flow require detailed planning and careful coordination of the work phases.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.