HAOUARIA GAS PUMPING STATION

Description of the work

HAOUARIA GAS PUMPING STATION

The project consists of the construction of a compression unit, the renewal of five other existing units, and the general redevelopment of a gas pumping station in order to ensure the continuity of the transport of Algerian gas to Italy via underwater gas pipelines.

DÉTAILS DU PROJET

Client: Scogat - Snamprogetti

Fin du projet: 2007

Localisation: Haouaria, Nabeul

Montant: 3 000 000 DT

Etendue des travaux:

  • Construction of reinforced concrete structures for the foundations of the compression units.
  • Construction of pipe racks using metal framing.
  • Earthworks for underground pipes and networks.
  • Installation of electrical and control cables.
  • Exterior landscaping work.

Spécificités du projet:

  • The complexity of the project lies in the fact that the work is being carried out while maintaining normal operation of the station throughout the 11 months of construction. This project therefore required extreme vigilance and rigorous coordination.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.