Société Bouzguenda Frères

Project

LIQUEFIED HYDROCARBON STORAGE DEPOT

Description of the work

LIQUEFIED HYDROCARBON STORAGE DEPOT

The project consists of the construction of a new liquefied hydrocarbon storage facility with a total capacity of 24,000 m³ in Gabès, composed of 6 storage spheres. The spheres rest, via a metal insert, on a circular inner reinforced concrete wall; the foundation slab is supported by bored piles 13 m long and 600 mm in diameter.

DÉTAILS DU PROJET

Client: National Petroleum Distribution Company AGIL

Fin du projet: 2017

Localisation: Gabes

Montant: 6 550 000 DT

Etendue des travaux:

  • Civil engineering, roadworks, and utility networks, including:
  • Earthworks and site levelling
  • Construction of the foundation slabs for the storage spheres
  • Drilled pile foundations
  • Construction of the circular inner walls made of reinforced concrete that serve as supports for the spheres.
  • Creation of access roads and traffic areas
  • Installation of sanitation, water supply and electricity networks

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.