The MAT III plant is a new production unit belonging to the German mechatronics group Marquardt, located in the NEOPARK El Fejja technology park in Tunisia. This Marquardt Automotive Tunisia plant specializes in the manufacture of high-precision electronic and electromechanical components for the high-end automotive industry.

DÉTAILS DU PROJET

Client: MARQUARDT Tunisia

Fin du projet: 2024

Localisation: NEOPARK El Fejja, Manouba

Montant: 76 500 000 DT

Etendue des travaux:

  • The construction project for the MAT III plant of MARQUARDT Tunisia is a single-lot project comprising the following lots:
  • Civil engineering: Structural and finishing work, including hollow-core slabs, industrial flooring, and prefabricated columns
  • Fluids: Installation of special plumbing, heating, ventilation and air conditioning (HVAC) systems.
  • Electricity: Installation of electrical systems, including power supply, lighting and security systems.
  • Sprinkler: Installation of an automatic fire suppression system

Spécificités du projet:

  • ESD (Electrostatic Discharge) coating
  • Magnesite soil.
  • Special doors including high-speed doors, sectional doors, fire doors and 2-hour fire-resistant textile curtain doors
  • A fully sprinklered unit
  • BIM (Building Information Modeling) tool: Used for smooth project management and optimal coordination of work.

Chiffres clés:

  • Very tight deadline for project completion: 15 months
  • Total area: 32,250 m².
  • Built area: 28,000 m² (including a production area, warehouses, an administrative building, technical facilities, a canteen, etc.)

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.