Société Bouzguenda Frères

Project

MG - COMMERCIAL BUILDING AND PARKING

Description of the work

MG - COMMERCIAL BUILDING AND PARKING

The project consists of the construction of a commercial real estate complex comprising 1 basement, 1 ground floor and 8 floors as well as a parking lot for the Tunisian supermarket chain "Magasin Général".

DÉTAILS DU PROJET

Client: SPI HAFEDH

Fin du projet: 2015

Localisation: Ennasr City, Tunis

Montant: 7 000 000 DT

Etendue des travaux:

  • Area: 12,000 m²
  • Earthworks
  • Structural work
  • Masonry and plastering work
  • Finishing work: Suspended ceilings, floor and wall coverings, interior and exterior carpentry, painting
  • Exterior landscaping and infrastructure (roads and utilities)

Spécificités du projet:

  • The main challenge of this project for the General Store lies in the very rugged nature of the terrain, which presents significant challenges in terms of soil stability, complex earthworks, the design of potentially special foundations, water management, difficult site access, and a clever architectural adaptation to integrate the topographical constraints. This specificity will require highly specialized technical expertise and meticulous planning at every stage of the project.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.