Description of the work

NEW BBM BRICK FACTORY

The project involves the construction of a new brick factory by Poulina Group Holding in the Tajerouine region of Kef. This new factory aims to increase the group's brick production capacity.

DÉTAILS DU PROJET

Client: POULINA GROUP HOLDING – BBM company

Fin du projet: 2024

Localisation: Tejerouine, Kef

Montant: 43 500 000 DT

Etendue des travaux:

  • Area: 38,000 m²
  • Earthworks
  • Deep Foundation Works (drilled piles)
  • Reinforced concrete works in foundations and elevations
  • Finishing work including masonry, plastering, and flooring

Spécificités du projet:

  • Structures Requiring Extreme Precision: The project includes the construction of crucial technical elements for a brick factory, namely the kiln, the pre-kiln, and the scouring chamber. These installations are at the heart of the brick-making process and demand highly precise engineering and execution to guarantee their proper functioning and efficiency.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.