Société Bouzguenda Frères

Project

New SAIDA factory at the El FEJJA technopole

Description of the work

New SAIDA factory at the El FEJJA technopole

The project to build the new SAIDA factory in the El FEJJA technopole involves constructing a modern and extensive biscuit factory

DÉTAILS DU PROJET

Client: TUNISIAN BISCUIT COMPANY (SOTUBI)

Fin du projet: 2022

Localisation: NEOPARK El Fejja, Manouba

Montant: 16 000 000 DT

Etendue des travaux:

  • Area: 22,000 m²
  • Earthworks
  • Reinforced concrete works
  • Finishing work
  • waterproofing work

Spécificités du projet:

  • The unique aspect of this project lies primarily in the context of its execution during the COVID-19 pandemic, which necessitated constant adaptation of working methods, team management, and site logistics to cope with health restrictions (social distancing, worker absences due to lockdowns, etc.). Despite this context, the project's completion on schedule in January 2022 demonstrates the effectiveness of the methodology employed.

Chiffres clés:

  • 24,000 m³ of concrete
  • 15,000 m² of masonry
  • 40,000 m² of plaster
  • 7,000 m² of waterproofing complex

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.