Société Bouzguenda Frères

Project

Renovation of an R+10 Building

Description of the work

Renovation of an R+10 Building

The project involves converting an existing building, originally designed for residential use, into the headquarters of Majda Tunisia. The new building design comprises five blocks, each consisting of a basement, a ground floor, and 10 upper floors.

DÉTAILS DU PROJET

Client: Majda Tunisia Company

Fin du projet: 2023

Localisation: Le Kram, Tunis

Montant: 14 700 000 DT

Etendue des travaux:

  • Area: 23,000 m²
  • Demolition work on slabs and staircases
  • Reinforced concrete works at height
  • Masonry and plastering work
  • coating work
  • waterproofing work
  • Carpentry work
  • Painting work
  • Reinforcement work on the basement columns using relining
  • Treatment of corrosion at the subsoil level
  • Carbon fiber beam reinforcement work

Spécificités du projet:

  • Significant structural reinforcement work using jacketing and carbon fiber. These specialized interventions highlight the need for advanced technical expertise in civil engineering to ensure the building's solidity and safety.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.