RENOVATION OF THE MUNICIPAL SWIMMING POOL OF BELVEDERE IN TUNIS

The renovation project for the Belvédère municipal swimming pool in Tunis was completed within a very tight timeframe of six months. It aimed to modernize and bring this historic sports and leisure facility, located in the heart of Belvédère Park, up to standard. The work included refurbishing the pools, modernizing the technical installations, renovating the changing rooms and restrooms, improving accessibility, beautifying the surrounding areas, and enhancing security. The goal was to quickly provide a high-quality, comfortable, and safe swimming pool for the residents of Tunis within this limited timeframe.

DÉTAILS DU PROJET

Client: BIAT FOUNDATION

Fin du projet: 2024

Localisation: BELVEDERE, TUNIS

Montant: 10 000 000 DT

Etendue des travaux:

  • Installation of CFA piles for the foundation.
  • Careful demolition of the structures to be removed while preserving the existing facades.
  • Reinforced concrete work.
  • Prefabrication of the bleachers
  • Raising the bottom of the swimming pool.
  • Execution of road and utility works.
  • Installation of the floor coverings supplied by the Client.
  • Painting work and various finishing work.

Spécificités du projet:

  • Delicate demolition work to preserve existing walls and architectural appearance.
  • Record time for project completion: 6 months

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.