SEAWATER DESALINATION PLANT

Description of the work

SEAWATER DESALINATION PLANT

The project consists of the construction of the Djerba seawater desalination plant with an initial capacity of 50,000 m³/day, expandable to 75,000 m³/day. The main structures built include the reverse osmosis building, the pretreatment building, the administration building, the pumping station, the distribution networks, the infrastructure (roads, utilities, etc.), and the coastal and seawater intake structures.

DÉTAILS DU PROJET

Client: UTE group: FCC – Aqualia – INIMA

Fin du projet: 2018

Localisation: Djerba

Montant: 18 000 000 DT

Etendue des travaux:

  • Foundation work
  • Reinforced concrete works
  • Masonry work
  • Carpentry work
  • waterproofing work
  • Exterior cladding and facade work
  • Interior fit-out work (offices, technical rooms, etc.)
  • Interior and exterior carpentry work (doors, windows, etc.)
  • Sanitary and industrial plumbing work
  • Electrical work (high and low voltage, systems specific to a desalination plant)
  • Ventilation and air conditioning work (adapted to different buildings)
  • Construction work for HDPE distribution networks (diameters 315 mm and 400 mm)
  • Construction work for cast iron distribution networks (diameters 500 mm, 600 mm and 800 mm)
  • Road and utility works

Chiffres clés:

  • Concrete: 11,000 m3
  • Framework: 600 Tonnes
  • Underground pipelines: 20 km

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.