Société Bouzguenda Frères

Project

Servicing of the La Perle du Lac I Subdivision

Description of the work

Servicing of the La Perle du Lac I Subdivision

The project consists of the infrastructure development work for the "La Perle du Lac I" housing estate, located on the prestigious shores of Lake Tunis. This large-scale operation has provided this new neighborhood with all the essential infrastructure for a modern and pleasant living environment.

DÉTAILS DU PROJET

Client: LAKE TUNIS PROMOTION COMPANY (SPLT)

Fin du projet: 2019

Localisation: Les berges du Lac, Tunis

Montant: 37 000 000 DT

Etendue des travaux:

  • Area: 56 ha
  • Reinforced concrete structure works
  • Riverbank development works
  • Roadworks
  • Drinking water supply works
  • Electricity Supply Works
  • Public Lighting Works
  • Natural Gas Supply Works
  • Stormwater drainage works
  • Wastewater Treatment Works
  • Telecom network works
  • Urban design and landscape design work

Spécificités du projet:

  • This project presented a significant challenge due to its complexity and tight deadlines, requiring the mobilization of considerable human and material resources.

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.