Sfax Seawater Desalination Plant

Description of the work

Sfax Seawater Desalination Plant

The project involves building a seawater desalination plant in Sfax, Tunisia, with an initial capacity of 100,000 m³/day (expandable to 200,000 m³/day). Led by SONEDE and awarded to a consortium including ORASCOM, METITO, and COBRA, this large-scale project aims to secure the region's drinking water supply by harnessing a new, unconventional water source. The works include the seawater intake, the desalination plant, brine discharge, treated water storage and pumping, as well as support infrastructure and utilities. This project is crucial for addressing the water challenges facing the Sfax region.

DÉTAILS DU PROJET

Client: ORASCOM - METITO - COBRA Group

Fin du projet: 2025

Localisation: Gargour, Sfax

Montant: 96 550 000 TND

Etendue des travaux:

  • Civil engineering works for all components of the desalination plant.
  • Infrastructure works for all components of the desalination plant.
  • Construction of maritime structures such as capture towers and ballast blocks.

Chiffres clés:

  • Area: 80,000 m²
  • Volume of concrete to be used: 60,000 m³
  • Quantity of steel to be used: 8,800 tonnes
  • Fill volume: 120,000 m³
  • The most significant massive pour is that of the foundation slab for the seawater pumping station:
  • Concrete volume: 3,300 m³
  • Pouring time: 22 hours without stopping
  • Foundation slab depth: -14 m
  • Foundation slab thickness: 1.5 m
  • Maximum temperature of the concrete during pouring: < 32°C (despite an ambient temperature of 40°C)

Let's build the future project by project

Projects

Olympic Stadium

The largest stadium in Tunisia, with a capacity of 60,000; SBF constructed the entire load-bearing structure of the stadium, consisting of 64 portals, each 33 meters high.

Tunisian-Libyan Bank

SBF carried out the construction of the office building for the headquarters of the Tunisian-Libyan Bank BTL.

National Museum

The present project is located on the grounds of the Bardo National Museum, and mainly comprises two construction sites that were carried out in parallel and which are

Amen Clinic

This project consists of a basement, ground floor and 6 floors, it was completed on schedule and in accordance with the client’s objectives.

Transit Village

Construction of a village of Arab-Muslim architecture on a total area of ​​11,500 m2, of which 9,500 m2 are covered areas.

Azur City

An ambitious architectural project: On the banks of the suburbs, the SBF team carried out the structural work for the main commercial and leisure center in Tunisia.

Tunis City

SBF, the successful bidder for the “Structures” package of the project (with a 10-month deadline), proposed and implemented, as a replacement for the traditional solution

phosphoric acid unit

The M’dhila2 project involves a new 54% concentrated phosphoric acid production plant, with the aim of producing triple superphosphate at the existing M’dhila1 plant.